Intelligent Pigging of 16-inch dia ILBP Carried Out
The 347 mile long Indus Left Bank pipeline from Sui to Karachi was laid down in 1954 and commissioned in 1955. In those days intelligent pigging method was not developed and therefore this pipeline was non-pigable. In order to determine Read More