Go to Top

SSGC Team Completes Hot Taps at Engro Fertilizer Plant Dharki

NEWSSSGC has safely and successfully completed two 16″ dia Hot Taps on cooling water live lines on vertical bottle with Horizontal Drilling method and on horizontal pipe line with vertical drilling method at Engro Fertilizer Plants Dharki against service charges of Rs. 1.5 million.

On request from Engro Fertilizers Ltd and after approval from MD, SSGC, a team of Karachi Terminal Transmission Division left Karachi for Engro Fertilizer Dharki on July 5, 2013 The team completed the task three days later. As per HSE rules of Engro, SSGC’s hot tapping machine, tool tackles and vehicles were thoroughly checked by Engro HSE Team. The HSE standards of Engro Fertilizers Ltd. are very high and are strictly followed. SSGC’s machinery and workmanship have met their HSE standards and the team’s performance was commended by their executives.

Headlines