Rigorous implementation of UFG reduction plan by the dedicated UFG division formed (FY 2021) on Board’s Directives has been displaying Read More
First phase of 116-km transmission pipeline briskly completed
First phase of 116-km transmission pipeline briskly completed
SSGC has successfully commissioned the first phase of the 30’ dia. x 116-km transmission pipeline from Kotri to Karachi for Read More
On the road to restructuring and rehabilitation
SSGC – On the road to restructuring and rehabilitation
SSGC is working on improving its organizational structure viz-a-viz efficiency and effectiveness through upskilling, adequate training, and adequate resource utilization Read More
HSE&QA IN SSGC-TRANSFORMATION FROM ‘POST DEFECT REPORTING’ TO ‘ IN-BUILT QUALITY’
GO ONLINE AND PAY NOW
HSE & QA in SSGC – Transformation ‘from post defect reporting’ to ‘in-built Quality’
The scope of HSE&QA in SSGC expanded and improved with the introduction of in-built quality control concept instead of only Read More
Corrosion Control – Ensuring Infrastructure Integrity
A pioneering assessment of the structural soundness of above-ground pipelines at 56 main valve assemblies across the transmission pipeline network Read More