Go to Top

Gas Supply Closure Every Sunday Industrial And Captive Power

Shut Down BeginsA0 A0 A0A0 A0A0A0 A0A0A0A0A0A0A0A0A0A0A0 Sunday, November 22, 2015A0A0 A07.00 a.m.
Resumption of OperationsA0 A0 A0 A0A0A0A0 Monday, November 23, 2015A0A0 A07.00 a.m.
Total DurationA0A0 A0A0A0 A0A0A0 A0A0A0 A0A0A0 A0A0A0 A0 A0 A0 24 hours